Our Past Projects
Home / Projects
Shiya Sdn Bhd
Job Scope : Scaffolding Erection & Dismantling
- PIJ538 – Service Apartment at Jalan Cenderasari, Larkin, Johor
Timeline : 25/12/2020 – JULY 2022 - Twin Tower – Service Apartment at Jalan Tengku Azizah
Timeline : 25/12/2020 – JULY 2022 - PBB860 – Service Apartment at Jalan Bayu Puteri 2, Taman Bayu Puteri,
Johor Bahru
Timeline : AUG 2022 – Present - Trellis – Service Apartment at Jalan Jalan Abdul Razak / Jalan Lingkaran
Dalam, Johor Bahru, Johor.
Timeline : 25/12/2020 – Present
Shiya Sdn Bhd
Job Scope : Scaffolding Erection & Dismantling
- Skyline – Service Apartment at Mukim Bandar Johor Bahru, Johor. [Meldrum Height]
Timeline : 25/12/2020 – Present - GreenLand – Service Apartment at Persiaran Abu Bakar Sultan, Mukim
Bandar Johor Bahru, Johor. [DangaBay]
Timeline : Dec 2023 – Present
OnnMetal Sdn Bhd
- Suria City Hotel, JB
Scope : Repair Works- Erection & Dismantling of Scaffolding.
Timeline : 07/01/2017 -15/06/2017 - Laman Mahkota Istana Bukit Serene (Crown), JB
Scope : Platform for cleaning the Crown- Erection&Dismantling of Scaffolding.
Timeline : June,2020 & Jan,2022 - Istana Polo, (Dining Room) JB
Scope : Platform for cleaning the Light at Dining Area- Erection & Dismantling of
Scaffolding.
Timeline : Oct,2021 - Airport Clock Tower, (Senai, JB)
Scope : Platform for cleaning the Crown – Erection & Dismantling of Scaffolding.
Scope : Early 2022
Kimlun Sdn Bhd
P655 – Slip-In and Slip-Out of Senai Desaru Expressway (SDE) Spur Road Messrs Meridin East Sdn Bhd
Timeline : May 2021P660 – Lebuhraya Laluan Kedua Malaysia-Singapura (LINKEDUA)
Timeline : April 2021 – May 2022P719 – Scaffolding Work at Taman Setia Tropika, Mukim Tebrau,
Daerah Johor Bahru, Johor for MESSRS Setia Indah Sdn Bhd.
Timeline : 16/4/21 – Jul 2022P734 – Scaffolding Work at Taman Sutera Utama (Shop lot 3 Storey)
for MESSRS Tanah Sutera Development SB.
TimeLine : June 2022– April 2024
Kimlun Sdn Bhd
P762 – Scope of Work: Scaffolding Work at RMMJ-D Bukit Senadi (Service Apartment)
for MESSRS Bandar Nusajaya Development Sdn Bhd.
Timeline : Oct 2023– PresentP760 – Scope of Work: Scaffolding Work at Horizon Mall Horizon Hills (4 Storey
Shopping Center with Facilities) for MESSRS Horizon Hills Development Sdn Bhd.
Timeline : Sep 2024– PresentP771 – Scope of Work: Scaffolding Work at Taman Eko Botanic , Duduk 1 (Podium For
Service Apartment) for MESSRS Eco Botanic Sdn Bhd.
Timeline : Apr 2024– PresentP801 – Scope of Work: Scaffolding Work at Taman Eko Botanic 2, Duduk 2 (Podium For
Service Apartment) for MESSRS Melia Spring Sdn Bhd.
Timeline : Aug 2024– Present
Hongxin Construction Sdn Bhd
Proposed Johor Affordable Homes (RMMJ), Double-Storey Terrace Houses Type
A, B, C, and D at PTD 84134, Bandar Dato’ Onn, Mukim Tebrau, Johor Bahru
for Johor Land Bhd:
Scope: Erection and dismantling of metal scaffolding works.
Timeline: 01/03/2019 – 23/05/2021Proposed 20-Storey Commercial Building at Lot 1259, Mukim Rawang, Gombak
for Audio Phonar Electronics Sdn Bhd:
Scope: Erection and dismantling of metal scaffolding works.
Timeline: 01/05/2019 – 01/12/2021IOI Kulai (P82):
Scope: Repair works involving erection and dismantling of scaffolding.
Timeline: 01/12/2016 – 15/03/2017Double Storey House @ Bandar Dato Onn (P98) for MESSRS Johor Land Bhd.
Timeline : Mar, 2019 -Apr, 2020
UM Land Builders Sdn Bhd
Proposed Mixed-Use Strata Comercial Building (26-Storey) at PTD 187578, Medini Iskandar, Nusajaya, Mukim Pulai, Nusajaya Johor, for Medini Lakeside Development Sdn Bhd.
Scope : Erection & Dismantling of Metal Scaffolding Works, Scaffold Supervisor & Scaffold Inspector.
Time line : (1/02/2020 – Sep 2024)
Pamir Development Sdn Bhd
- Proposed 12-Storey Commercial Building at Lot PTD 77619, Bandar Putra Kulai, Johor for Nice Frontier Sdn Bhd:
Scope: Erection and dismantling of metal scaffolding works.
Timeline: 25/09/2020 – April 2022
Malpakat Group Sdn Bhd
- Scaffolding Works (20 Storey Hotel Building) at LOT 63906, Jalan Permas Jaya10/10, Bandar Baru Permas Jaya, Mukim Plentong, Daerah Johor Bahru, JDT.
Scope : Erection & Dismantle Scaffolding Materials, Inspection.
Timeline : Aug, 2024 – Present
Outsource Project Clients
- Ensignia Southkey City Sdn Bhd.
- Midvalley Megamall, Southkey City, JB.
- (ECA SB) Hotel Tower, Midvalley Southkey, JB.
- Realis Hotel, Southkey Johor.
- (Landasan Cahaya SB) Midvalley JB
Scope : Scaffold Inspector.
Scope : Erection&Dismantling of Metal Scaffolding Works.
Time Line : 24/11/2016 – 2020
Win Modern Design Sdn Bhd
Job Scope : Scaffolding Erection & Dismantling
- AH02 – Service Apartment at Jalan Indah, Mukim Tebrau [Aliff Height]
Timeline : Oct 2022 – July 2024 - PM01 – Turnkey Project for Revival Abandoned Pacific Mall into Mixeduse Hotel, Office and others facilities at Bukit Cagar, Jalan Storey, Bandar Johor Bahru, For Merrss SKS Premium Sdn Bhd. [Pacific Mall]
Timeline : Sep 2023 – Precent
OKA Marketing Sdn Bhd
Job Scope : Scaffolding Erection & Dismantling
- V106 – Government Office Building at Majlis Pembandaran Kluang. [MPK]
Timeline : Aug 2022 – Oct 2024 - V135 – Build a recreation park near Pasir Gudang Stadium [TMIYC]
Timeline : Aug 2023 – Dec 2024 - V137 – Government Office Building at Majlis Bandaraya Pasir Gudang [MBPG]
Timeline : Nov 2023 – Present - V151 – Retrieve old Building at Muzium Tokoh, at bandar Johor Bahru [Muzium Tokoh]
Timeline : Oct 2023 – Present