Our Past Projects

Home / Projects

Shiya Sdn Bhd

Job Scope : Scaffolding Erection & Dismantling

  • PIJ538 – Service Apartment at Jalan Cenderasari, Larkin, Johor
    Timeline : 25/12/2020 – JULY 2022
  • Twin Tower – Service Apartment at Jalan Tengku Azizah
    Timeline : 25/12/2020 – JULY 2022
  • PBB860 – Service Apartment at Jalan Bayu Puteri 2, Taman Bayu Puteri,
    Johor Bahru
    Timeline : AUG 2022 – Present
  • Trellis – Service Apartment at Jalan Jalan Abdul Razak / Jalan Lingkaran
    Dalam, Johor Bahru, Johor.
    Timeline : 25/12/2020 – Present

Shiya Sdn Bhd

Job Scope : Scaffolding Erection & Dismantling

  • Skyline – Service Apartment at Mukim Bandar Johor Bahru, Johor. [Meldrum Height]
    Timeline : 25/12/2020 – Present
  • GreenLand – Service Apartment at Persiaran Abu Bakar Sultan, Mukim
    Bandar Johor Bahru, Johor. [DangaBay]
    Timeline : Dec 2023 – Present

OnnMetal Sdn Bhd

  • Suria City Hotel, JB
    Scope : Repair Works- Erection & Dismantling of Scaffolding.
    Timeline : 07/01/2017 -15/06/2017
  • Laman Mahkota Istana Bukit Serene (Crown), JB
    Scope : Platform for cleaning the Crown- Erection&Dismantling of Scaffolding.
    Timeline : June,2020 & Jan,2022
  • Istana Polo, (Dining Room) JB
    Scope : Platform for cleaning the Light at Dining Area- Erection & Dismantling of
    Scaffolding.
    Timeline : Oct,2021
  • Airport Clock Tower, (Senai, JB)
    Scope : Platform for cleaning the Crown – Erection & Dismantling of Scaffolding.
    Scope : Early 2022

Kimlun Sdn Bhd

  • P655 – Slip-In and Slip-Out of Senai Desaru Expressway (SDE) Spur Road Messrs Meridin East Sdn Bhd
    Timeline : May 2021

  • P660 – Lebuhraya Laluan Kedua Malaysia-Singapura (LINKEDUA)
    Timeline : April 2021 – May 2022

  • P719 – Scaffolding Work at Taman Setia Tropika, Mukim Tebrau,
    Daerah Johor Bahru, Johor for MESSRS Setia Indah Sdn Bhd.
    Timeline : 16/4/21 – Jul 2022

  • P734 – Scaffolding Work at Taman Sutera Utama (Shop lot 3 Storey)
    for MESSRS Tanah Sutera Development SB.
    TimeLine : June 2022– April 2024

Kimlun Sdn Bhd

  • P762 – Scope of Work: Scaffolding Work at RMMJ-D Bukit Senadi (Service Apartment)
    for MESSRS Bandar Nusajaya Development Sdn Bhd.
    Timeline : Oct 2023– Present

  • P760 – Scope of Work: Scaffolding Work at Horizon Mall Horizon Hills (4 Storey
    Shopping Center with Facilities) for MESSRS Horizon Hills Development Sdn Bhd.
    Timeline : Sep 2024– Present

  • P771 – Scope of Work: Scaffolding Work at Taman Eko Botanic , Duduk 1 (Podium For
    Service Apartment) for MESSRS Eco Botanic Sdn Bhd.
    Timeline : Apr 2024– Present

  • P801 – Scope of Work: Scaffolding Work at Taman Eko Botanic 2, Duduk 2 (Podium For
    Service Apartment) for MESSRS Melia Spring Sdn Bhd.
    Timeline : Aug 2024– Present

Hongxin Construction Sdn Bhd

  • Proposed Johor Affordable Homes (RMMJ), Double-Storey Terrace Houses Type
    A, B, C, and D at PTD 84134, Bandar Dato’ Onn, Mukim Tebrau, Johor Bahru
    for Johor Land Bhd:
    Scope: Erection and dismantling of metal scaffolding works.
    Timeline: 01/03/2019 – 23/05/2021

  • Proposed 20-Storey Commercial Building at Lot 1259, Mukim Rawang, Gombak
    for Audio Phonar Electronics Sdn Bhd:
    Scope: Erection and dismantling of metal scaffolding works.
    Timeline: 01/05/2019 – 01/12/2021

  • IOI Kulai (P82):
    Scope: Repair works involving erection and dismantling of scaffolding.
    Timeline: 01/12/2016 – 15/03/2017

  • Double Storey House @ Bandar Dato Onn (P98) for MESSRS Johor Land Bhd.
    Timeline : Mar, 2019 -Apr, 2020

UM Land Builders Sdn Bhd

  • Proposed Mixed-Use Strata Comercial Building (26-Storey) at PTD 187578, Medini Iskandar, Nusajaya, Mukim Pulai, Nusajaya Johor, for Medini Lakeside Development Sdn Bhd.
    Scope : Erection & Dismantling of Metal Scaffolding Works, Scaffold Supervisor & Scaffold Inspector.
    Time line : (1/02/2020 – Sep 2024)

Pamir Development Sdn Bhd

  • Proposed 12-Storey Commercial Building at Lot PTD 77619, Bandar Putra Kulai, Johor for Nice Frontier Sdn Bhd:
    Scope: Erection and dismantling of metal scaffolding works.
    Timeline: 25/09/2020 – April 2022

Malpakat Group Sdn Bhd

  • Scaffolding Works (20 Storey Hotel Building) at LOT 63906, Jalan Permas Jaya10/10, Bandar Baru Permas Jaya, Mukim Plentong, Daerah Johor Bahru, JDT.
    Scope : Erection & Dismantle Scaffolding Materials, Inspection.
    Timeline : Aug, 2024 – Present

Outsource Project Clients

  • Ensignia Southkey City Sdn Bhd.
  • Midvalley Megamall, Southkey City, JB.
  • (ECA SB) Hotel Tower, Midvalley Southkey, JB.
  • Realis Hotel, Southkey Johor.
  • (Landasan Cahaya SB) Midvalley JB
    Scope : Scaffold Inspector.
    Scope : Erection&Dismantling of Metal Scaffolding Works.
    Time Line : 24/11/2016 – 2020

Win Modern Design Sdn Bhd

Job Scope : Scaffolding Erection & Dismantling

  • AH02 – Service Apartment at Jalan Indah, Mukim Tebrau [Aliff Height]
    Timeline : Oct 2022 – July 2024
  • PM01 – Turnkey Project for Revival Abandoned Pacific Mall into Mixeduse Hotel, Office and others facilities at Bukit Cagar, Jalan Storey, Bandar Johor Bahru, For Merrss SKS Premium Sdn Bhd. [Pacific Mall]
    Timeline : Sep 2023 – Precent

OKA Marketing Sdn Bhd

Job Scope : Scaffolding Erection & Dismantling

  • V106 – Government Office Building at Majlis Pembandaran Kluang. [MPK]
    Timeline : Aug 2022 – Oct 2024
  • V135 – Build a recreation park near Pasir Gudang Stadium [TMIYC]
    Timeline : Aug 2023 – Dec 2024
  • V137 – Government Office Building at Majlis Bandaraya Pasir Gudang [MBPG]
    Timeline : Nov 2023 – Present
  • V151 – Retrieve old Building at Muzium Tokoh, at bandar Johor Bahru [Muzium Tokoh]
    Timeline : Oct 2023 – Present